TAF/TAP TSI Working Groups relevant for Operations

WG 2 - Train run information:
Defines the information flow between the partners during train run including train run forecast, train location information and service disruption.

Task:
As the requirements for information exchange during the train run described within the TAF TSI regulation are offering a lot of space for different interpretations, in order to ensure the same understanding and harmonised implementation the operational experts with the support of IT experts, both from the IM and RU companies, together described the process of Train Running and Service Disruption and defined the needed messages to be exchanged during the processes.

Project status:
The process description for Train Running and for handling the Service Disruptions between neighbouring IMs and with contracted RU were made. Messages to be exchange during these processes were deeply analysed and their content and structure was agreed between the working group members.  Working group is now continuing on writing the Implementation Guideline, explaining in details all the results of the working group.
WG 3: Train preparation:
Defines the train ready and train composition messages.

Task:
Based on the requirements stated in the TAF TSI regulation, working group developed the business process description for Train Preparation process and defined and analysed the messages to support the information exchange during the whole process. 

Project Status:
The WG has created two process descriptions for Train preparation process. One process is to be used in the open access mode, so if one RU is operating the train along the several IM networks and second process is reflecting the situation when several RUs are cooperating in train operation. Also the first analyses of content and structure of the related messages were made.